i have just brought a BD double ledge, after connecting the longer two poles (the ones that run from end to end) when i go to put in the intial short pole (the pole that goes from side to side) it is really hard, now i am not a weak person and this is just trying to put it up on the ground, when i had a go at putting it up at the cliff the other day it was next to impossible, is there some trick i am missing, it seems pretty basic.... i have sprayed some bike chain oil in the joint and used some sandpaper on the joint as well
thanks |