On 3/05/2006 stugang wrote:
>bunch of VERY small footers
>bolted directly into the wood on the lower part of the wall
We do have a bag full of bolt on footers. They'll probably be the last thing to go on, but they will definitely go on :-) The order I aim to work in is to get the main routes on the walls (minimum 3 main routes per wall), then boulder problems, then fill the remaining teenuts as best we can with random coloured holds that have been donated, then add the scew-on holds. |